
Web Engineering •
Zero downtime database migration: 5 flags and a 17x P90 gap
A zero downtime database migration is five feature-flagged phases, not a cutover. P95 said 4x slower, P90 said 17x, and the comparison code took a region down.
12 min read
Read more →